Add to Gallery: | Add this photo to a Gallery |
Category: | A general photo.: Other (infrastructure-related) |
Tags: | cbl2pb |
Date time: | 8.32am, Sunday 28th October, 2018 |
Time line: | Earlier | Later |
Facing: | Bearing of 266° |
Added by: | scrapper |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Chesterfield |
Junction of at least two cycleable trails, that could readily be improved, the east-west trail needs upgrading to Multi User Trail to connect Poolsbrook and Markham Vale
Comments reflect the views of the original submitter only.