Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | None |
Date time: | 3.32pm, Friday 11th October, 2019 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | peakphotos |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Chesterfield |
some ponding occurs after heavy or prolonged rain
Comments reflect the views of the original submitter only.